Customization: | Available |
---|---|
Connection: | Female |
Structure: | Universal |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
DN(mm) | F(inches) | B | C | G | A |
15 | 1/2 " | 32.7 | 29 | 8 | 44.7 |
20 | 3/4 " | 41.5 | 33 | 8 | 61.35 |
25 | 1" | 46.5 | 39 | 8 | 67.7 |
32 | 11/4" | 58.3 | 45 | 8 | 79.3 |
40 | 11/2" | 67.5 | 46 | 9 | 87.6 |
50 | 2" | 75.3 | 53 | 9 | 97 |
65 | 21/2" | 91.8 | 54 | 10 | 110.2 |
80 | 3" | 108.5 | 56 | 11 | 131.4 |
100 | 4" | 139.1 | 60 | 11 | 159.5 |
125 | 5" | 168.4 | 66 | 12 | 188.4 |
150 | 6" | 199.6 | 68.75 | 12 | 240 |
200 | 8" | 257.18 | 95.5 | 24 | 298.45 |
Product | Aluminum camlock coupling/камлок соединения |
Key words | AL camlock fittings, hose couplings, quick connect for PVC hose, quick realse camlock coupling, Cam & groove coupling, camlock couplings, camlock connectors , Kamlock, camlock quick couplings, camlock quick hose coupling, camlock dust cap coupling, camlock dust plug coupling, camlock coupling 4" male adapter |
Body material | Aluminum |
Handles | Brass or stainless steel |
Pins, Rings and Safety clip material | Carbon steel plated or stainless steel |
Sizes | 1/2" to 8" |
Thread | NPT, BSPP, BSPT |
Seal | BUNA(NBR), Viton and Telfon,Silicon, EPDM |
Standard | A-A-59326 (MIL-C-27487)or DIN 2828 |
Camlock coupling | Gravity casting/Die casting |
Working temperature | -150°F to +250°F (-101°C to 121°C) |
Working pressure | max 250psi |
Application | Oil, water, industries, |
Place of origin | Shandong, China |
Package | Plastic bag and Cartons then Pallet |
advantage | quick, safey and no need tools |
Delivery | By sea, By air and By express |
Lead time | withinn 35-45 days after confiming the normal order |